When routing new tracks, there is a nice PCBNew feature that draws the DRC bounary box when approaching other networks, which “stops” the new track at the DRC limit distance and prevents accidential DRC violations, which is very helpful.
However, when dragging existing tracks the same feature is not working and there’s nothing (except for the Highlighted DRC violation) that would make it easier to tidy up the tracks. I mean, I would like to see the DRC boundary box and have the Interactive Router to “stop” my dragged segment right on the DRC limit.
I mean, something like “Snap to DRC boundary box”.
Is such feature somewhere on the roadmap?
This topic was automatically closed 90 days after the last reply. New replies are no longer allowed.