Here is my problem. I did a 2 layer board layout and when I did GND polygon pour at the end I noticed that it is highly fragmented and there is not much I can do about it. So, next step is to go with a four layer design. I don’t want to reroute the whole design. Is there a way to transfer existing tracks to the internal layers?
Edit --> Swap Layers.
This only affects tracks. Copper pour needs to be changed manually.
Thanks! That did it!